Industry & ProductionSpecial Issue · Plant Production Manager - AutomotiveVol. 08 · 2026

Carlos
Mendes

Lean, safe and relentlessly improving.your.email@example.com - +00 00000 00000
PHOTO

At a Glance

Based inCity, Country
LinkedInlinkedin.com/in/yourname

Expertise

Production
Assembly lines, Body shop, CNC machining, Robotics
Lean & Quality
TPM, SMED, Kaizen, 8D, PPAP / APQP
Safety
ISO 45001, LOTO, Risk assessment, 5S
Systems
SAP PP, MES, Minitab, AutoCAD

Certifications

Lean Six Sigma Black Belt (2019)
IATF 16949 Internal Auditor (2018)

Profile

Production leader with 12+ years in automotive assembly and component manufacturing. Drives safety, quality and throughput with lean methods, TPM and data-driven problem solving, and leads shift teams of 300+.

“Lifted OEE from 68% to 84% and cut defects by 89%.”

Experience

Plant Production Manager

Vertex Auto Components · Feb 2020–Present
  • Raised OEE from 68% to 84% with TPM and SMED, adding 22k units of annual capacity.
  • Cut PPM defects from 420 to 45 with 8D problem solving and poka-yoke.

Production Engineer - Body Shop

Northline Motors · Jun 2015–Jan 2020
  • Launched 2 new vehicle programmes and validated 64 robotic weld cells.
  • Reduced cycle time by 11% through line balancing.

Graduate Engineer Trainee

Precision Castings Ltd · Jul 2013–May 2015
  • Introduced SPC charts on 12 CNC lines, cutting scrap by 18%.

Projects

OEE Improvement Programme

TPM · SMED · 2021

Plant-wide programme lifting OEE by 16 points across 9 lines.

Zero-Defect Line

Quality · Poka-yoke · 2022

Error-proofing that cut customer PPM from 420 to 45.

Education

B.E., Mechanical & Automobile Engineering

Sample Institute of Engineering · 2009 - 2013